AN 01-25CN-2
TABLE OF CONTENTS
Section
Page
I Description, Dimensions and Leading
1 Description
2 Dimensions
3 Leading Particulars
II Shipment and Erection Procedure
18
1 Shipment of Aircraft
18
a Description
18
b Uncrating the Panel Box
18
c Uncrating the Fuselage Box
18
2 Erection
25
3 Rigging
27
III Handling and General Maintenance Instructions
30
1 Access and Inspection Provision
30
2 Ground Handling
30
a Hoisting
30
b Jacking Arrangement
30
c Leveling
30
d Tie Down
30
e Parking Brakes and Surface Controls
30
f Servicing Fuel, Oil, Coolant, Hydraulic Oil, Brake Fluid, and Oxygen
31
3 Ground Operating Instructions
31
a Starting the Engine
31
b Engine Warm-Up
31
4 Lubricating Requirements
33
5 List of Special Tools
33
IV Major Component Parts- and Installation
37
1 Wings
37
a Descritioj
37
b Removal and Disassembly
37
c Test Before Assembiy
47
d Installation
47
2 Tail Group
47
a Description
47
b Removal and Disassembly
49
c Assembly and Installation
50
3 Body Group
50
a Fuselage
50
4 Alighting Gear
50
a Main Landing Gear
50
(1) General
50
(2) Wheels and Brakes
51
(3) Filling and Bleeding the Hydraulic Brake System
52
(4) Installation and Disassembly
52
(a) To Remove the Landing Gear
52
(b) To Disassemble the Oleo Strut
60
(c) To Assemble the Oleo Strut
64
(d) To Install the Oleo Strut
66
(e) To Adjust the Warning System
70
(f) To Remove the Master Brake Cylinde
70
(g) To Disassemble the Master Brake Cylinde
70
(h) To Assemble the Master Brake Cylinder
73
(i) To Disassemble the Hydraulic Brake Cylinder
73
b Tail Wheel Assembly
75
(1) General
75
(2) Installation and Disassembly
76
(3) To Remove the Oleo Strut
76
(4) To Disassemble the Oleo Strut
76
(5) To Assemble the Oleo Strut
81
(6) To Install the Oleo Strut
81
(7) To Remove the Retracting Strut
81
(8) To Disassemble the Retracting Strut
81
(9) To Assemble the Retracting Strut
83
(10) Adjustment of the Tail Wheel Doors
83